PLEASE NOTE: Dates are estimates and are only valid until your cutoff day.

  • Orders containing products with varying lead times will be scheduled to the longest lead time.
  • Separate orders need to be placed by product type to accomodate different lead times.

Windows: Aluminum Clad Wood & All-Wood Residential Ship Week Residential Lead Time Commercial Ship Week Commerical Lead Time
NEW Casements & Awnings 11/16/26 5 weeks 11/23/26 6 weeks
NEW Equal & Unequal Arch Casements 11/30/26 7 weeks 12/7/26 8 weeks
NEW Pushout & French Casements 11/16/26 5 weeks 11/23/26 6 weeks
NEW Pushout Arch, Unequal Arch, Springline & Qtr Springline Casement 11/30/26 8 weeks 12/07/26 9 weeks
NEW Direct Sets, Rectangle 11/09/26 4 weeks 11/16/26 5 weeks
NEW Direct Sets, Radius 11/30/26 8 weeks 12/07/26 9 weeks
Casements & Awnings (WI) 11/2/26 3 Weeks 11/9/26 4 Weeks
Westchester Double & Single Hungs 1/4/27 12 Weeks 1/11/27 13 Weeks
Monument Double & Single Hungs 12/14/26 9 Weeks 12/21/26 10 Weeks
Monument Double & Single Hung, Radius 12/14/26 9 Weeks 12/21/26 10 Weeks
Sash Packs & All-Wood Double Hung 11/9/26 4 Weeks 11/16/26 5 Weeks
French Casements (CA) 11/16/26 5 weeks 11/23/26 6 weeks
Direct Sets, Rectangle (WI) 11/2/26 3 Weeks 11/9/26 4 Weeks
Direct Sets, Radius (WI) 11/30/26 7 Weeks 12/7/26 8 Weeks
H3® Windows Residential Ship Week Residential Lead Time Commercial Ship Week Commerical Lead Time
H3 Casements & Awnings 11/23/26 6 weeks 11/30/26 7 weeks
H3 Double Hungs & Sliders 11/23/26 6 weeks 11/30/26 7 weeks
H3 Direct Sets, Rectangle 11/16/26 5 weeks 11/23/26 6 weeks
H3 Direct Sets, Radius 12/7/26 8 weeks 12/14/26 9 weeks
Doors: Aluminum Clad Wood, All-Wood Residential Ship Week Residential Lead Time Commercial Ship Week Commerical Lead Time
NEW Inswing & Outswing, Sliding & Direct Set Sliding Doors 12/14/26 9 Weeks 12/21/26 10 Weeks
Inswing & Outswing Doors (CA) 12/14/26 9 weeks 12/21/26 10 weeks
Inswing & Outswing Doors (WI) 11/23/26 6 Weeks 11/30/26 7 Weeks
Commercial Swing Doors (WI) 11/23/26 6 Weeks 11/30/26 7 Weeks
Radius Swing Doors (CA) 12/14/26 9 weeks 12/21/26 10 weeks
Radius Swing Doors (WI) 12/7/26 8 Weeks 12/14/26 9 weeks
Sliding Doors (CA) 12/14/26 9 weeks 12/21/26 10 weeks
Sliding Doors (WI) 11/23/26 6 Weeks 11/30/26 7 Weeks
Door Transoms (WI) 12/7/26 8 Weeks 12/14/26 9 Weeks
Doors: Specialty Residential Ship Week Residential Lead Time Commercial Ship Week Commerical Lead Time
Multi-Slide Doors 11/09/26 4 weeks 11/16/26 5 weeks
Bi-Fold Doors (CA) 11/09/26 4 weeks 11/16/26 5 weeks
Lift & Slide Doors 11/16/26 5 weeks 11/23/26 6 weeks
Pivot Doors 11/16/26 5 weeks 11/23/26 6 weeks
FeelSafe™ Windows & Doors Residential Ship Week Residential Lead Time Commercial Ship Week Commerical Lead Time
H3 Feelsafe Casements & Awnings 11/30/26 7 Weeks 12/7/26 8 Weeks
H3 FeelSafe Double & Single Hungs 11/30/26 7 Weeks 12/7/26 8 Weeks
H3 FeelSafe Direct Sets 11/23/26 6 Weeks 11/30/26 7 Weeks
FeelSafe Casements & Awnings 11/16/26 5 Weeks 11/23/26 6 Weeks
FeelSafe Double & Single Hungs 12/14/26 9 Weeks 12/21/26 10 Weeks
FeelSafe Direct Sets, Rectangle 11/23/26 6 Weeks 11/30/26 7 Weeks
FeelSafe Bi-Fold Doors 12/7/26 8 Weeks 12/14/26 9 Weeks
FeelSafe Outswing Doors 11/30/26 7 Weeks 12/7/26 8 Weeks
FeelSafe Sliding Doors 11/30/26 7 Weeks 12/7/26 8 Weeks
FeelSafe Direct Sets, Radius 12/7/26 8 Weeks 12/14/26 9 Weeks
Vinyl Windows & Doors Residential Ship Week Residential Lead Time Commercial Ship Week Commerical Lead Time
Casements & Awnings 11/9/26 4 Weeks 11/16/26 5 Weeks
Premium Series 11/30/26 7 Weeks 12/7/26 8 Weeks
Designers’ Series 11/16/26 5 Weeks 11/23/26 6 Weeks
Builders’ Series 10/26/26 2 Weeks 11/2/26 3 Weeks
Direct Sets, Rectangle 10/26/26 2 Weeks 11/2/26 3 Weeks
Direct Sets, Radius Shapes 10/26/26 2 Weeks 11/2/26 3 Weeks
Sliding Doors 10/26/26 2 Weeks 11/2/26 3 Weeks


Vinyl

  • Painted vinyl will add 1 additional week to any posted lead time of 2-weeks or less.
  • Blinds between the glass will add 5 weeks to all posted lead times.

 
Clad / Wood

  • Ultra Coat, Ultra Stain & Clear Coat require a minimum of 6-week lead time.
  • Custom Ultra Coat & Custom Ultra Stain, add 2 weeks to the posted lead time.
  • Genius screens, add 2 weeks to posted lead time.
  • Wood species other than Pine, Douglas Fir & Alder require a 10-week lead time.
  • Clad Raised Panel Inserts require a 6-week lead time.
  • Custom Clad Colors require a minimum 10-week lead time.
  • Blinds between the glass requires an 8-week lead time.
  • Clic glass requires a 20-week lead time.
  • Heat Strengthened glass requires a 5-week lead time.
  • New SP Casements/Awnings/Direct Sets with Brickmould, add 2 weeks to posted lead time.